Status Largely executed — 8 of 10 tracks completed
Version 1.2.0
Last Updated 2026-09-10
Author Prepared from decision checklist (Seshadri’s responses)
Document Type Design reference
Decisions source north-star-production-readiness-decision.md (D1–D18, all answered)
Analysis source north-star-evaluation.md, 07-quality/integration-tests-approach.md, ADR-013
Epic TRACK-109 Production Readiness Roadmap

North-Star Production Readiness — Implementation Plan


[!NOTE] Design/reference material: this page may include proposals or earlier implementation assumptions. Use current feature map for implemented behavior and current operating steps.

This converts the 18 answered decisions into nine new conductor tracks plus the bookkeeping to existing tracks. Each track section below is written to be lifted directly into a conductor/tracks/TRACK-XXX-*.md file. Hand this back with “create the tracks” and I’ll generate the files and update the registry.

v1.1 changes: (1) TRACK-096 is paused alongside TRACK-093 (confirmed). (2) Versioned canon is split — TRACK-116 is a design-only architecture spike producing ADR-014, and TRACK-117 is the implementation; frontend tests move to TRACK-118.

Decision → work traceability

Decision Outcome Lands in
D1 Pause import; design versioned canon (spike→ADR-014); implement; re-import fresh (no retrofit) TRACK-116 (spike) + TRACK-117 (impl)
D2 Freeze migrations 1 day; Flyway rename first TRACK-110
D3 argon2id + rehash-on-login TRACK-114
D4 TRACK-110–113 under TRACK-109 epic all
D5 Revive TRACK-035; supersede TRACK-014 TRACK-113 + bookkeeping
D6 Defer N4 / N6 / public surface scope guard (all)
D7 Testcontainers everywhere TRACK-111
D8 Blocking, PR-triggered CI TRACK-111
D9 unit <30s, integ <3min, E2E nightly TRACK-111/113
D10 @Tag("integration") + task TRACK-110
D11 Duplicate test-support, extract at DAL suite TRACK-110/111
D12 Three money paths confirmed TRACK-113
D13 Frontend component tests separate TRACK-118
D14 Flyway Docker image, version-pinned TRACK-110
D15 01(−admin)/03/04/05 → R__; admin → bootstrap; 02 → dev TRACK-110 (+ admin from TRACK-114)
D16 Drop legacy tracking tables after one db-reset TRACK-110
D17 Podman deferred to Phase 3 out of scope (noted)
D18 Repo hygiene separate track, before CI TRACK-115

Master execution sequence

Track number ≠ execution order (conductor numbers by creation). Execute in this order; dependencies in parentheses.

WEEK 1  ── stop the bleeding, open the freeze ──────────────────────────────
  1. TRACK-114  Password hashing (argon2id)          ✅ Completed
  2. TRACK-115  Repo hygiene + token rotation         ✅ Completed
  3. ⏸ FREEZE   Checkpoint + PAUSE TRACK-093 AND TRACK-096; freeze new migrations (D2)
  4. TRACK-116  Versioned canon ARCHITECTURE SPIKE → ADR-014   ✅ Completed
  5. TRACK-110  Flyway cutover + Testcontainers        ✅ Completed
WEEK 1–2 ── data model, while substrate test-wiring continues ──────────────
  6. TRACK-117  Versioned canon IMPLEMENTATION         🔄 Implementation done; re-import pending
WEEK 2–3 ── verification layer ─────────────────────────────────────────────
  7. TRACK-111  DAL suite + CI activation              ✅ Completed
  8. TRACK-112  Money-path service & API scenarios     ⬜ Not started
  9. TRACK-113  Worker + E2E (revive TRACK-035)        ✅ Completed
LATER / PARALLEL ───────────────────────────────────────────────────────────
 10. TRACK-118  Frontend component tests (Vitest)      ✅ Completed (55 tests)

Critical-path note (D1↔D2): the import stays paused only until TRACK-110’s Flyway cutover and TRACK-117’s versioned-canon migration land — not the whole testing initiative. The TRACK-116 spike is design-only and runs during the freeze (it produces ADR-014, authors no migration), so it adds no critical-path time. The Testcontainers test-wiring, DAL suite, CI, and scenarios (111–113) run after the import resumes and never block it.

Dependency graph:

              116 (spike/ADR-014) ─┐
114 ─┬─▶ 110 ─┼────────────────────┴▶ 117 ─▶ (re-import, resume 093/096)
115 ─┘        ├─▶ 111 ─┬─▶ 112
              │        └─▶ 113
              └────────────▶ 118 (after 111)

TRACK-114 — Authentication Hardening: Password Hashing (N1)

Field Value
Status to set Not Started → first in queue
Priority P0 — Blocker (north-star N1)
Decisions D3
Depends on none
Blocks TRACK-110 (admin-user bootstrap in seed tiering)
Est. ~1 day

Goal: replace the plaintext hashPassword() (UserManagementService.kt:143) with argon2id, with transparent rehash-on-next-login. Close the single most dangerous finding.

Checklist:

Acceptance: no plaintext password at rest; existing curator can log in without a manual reset; throttling demonstrable; tests green.

Docs to touch: ADR-004-authentication-strategy.md (note argon2id), current-versions.md (new lib).


TRACK-115 — Repository Hygiene & Secret Rotation (N8)

Field Value
Status to set Not Started
Priority P1 — do before CI (lowers noise floor)
Decisions D18
Depends on none
Blocks TRACK-111 (clean root → green first CI / secret scan)
Est. ~0.5 day

Goal: clean the repo root so the first CI run (and its secret/dependency scans) is green against a clean tree.

Checklist:

Acceptance: clean root; rotated token; hardened ignore; (optional) single agent-instruction source.


TRACK-110 — Testcontainers Substrate + Flyway Cutover (Steps 1–2)

Field Value
Status to set Not Started
Priority P0 — foundation for the whole initiative
Decisions D2, D7, D10, D11, D14, D15, D16
Depends on TRACK-114 (admin bootstrap hash)
Blocks 111, 112, 113, 116
Est. ~3–4 days

Goal: make integration tests self-provisioning via Testcontainers, and consolidate the two diverged migration runners onto Flyway (ADR-013). Two sub-parts; the Flyway-cutover sub-part is on the import critical path (the freeze can’t lift until it lands).

Sub-part A — Flyway cutover (critical path, during the D2 freeze):

Sub-part B — Testcontainers test substrate (not on import critical path):

Acceptance: ./gradlew check green on a machine with no Postgres on 5432 and only Docker present; make db-reset runs entirely through Flyway; reference data arrives via R__; legacy tables gone; freeze lifted.

Docs to touch: 04-database/migrations.md (finalize Flyway sections), getting-started.md, tech-stack.md, integration-tests-approach.md (mark Steps 1–2 done).


TRACK-116 — Versioned Canon: Architecture Spike + ADR-014 (N5)

Field Value
Status to set Not Started → can start during the freeze
Priority P1 — design gate for TRACK-117; unblocks the data-model decision
Decisions D1
Depends on none (design-only; does not need Flyway done)
Blocks TRACK-117
Est. ~2–3 days
Type Architecture spike — produces a decision + design, authors no migration

Goal: decide and document how the canonical record carries history and provenance, before any schema is written. Output is ADR-014 plus a concrete schema design, so TRACK-117 is pure execution.

Checklist:

Acceptance: ADR-014 merged with a chosen pattern, schema design, and migration shape; TRACK-117 can be executed without further design decisions.

Pre-req coordination: before the data-model work begins, checkpoint-commit and pause TRACK-093 AND TRACK-096 (the D2 freeze covers both). The spike itself can proceed during the freeze in parallel with TRACK-110.


TRACK-117 — Versioned Canon: Implementation + Re-Import (N5)

Field Value
Status to set Not Started
Priority P1 — time-sensitive (gates TRACK-093/096 resume)
Decisions D1
Depends on TRACK-116 (ADR-014 + design), TRACK-110 (Flyway cutover — migration authored in V/Flyway format)
Interacts with TRACK-093 (paused), TRACK-096 (paused)
Est. ~1 week
Scope note Phase-2 data-model item; outside the tests+CI+Flyway scope (D6) but sequenced here because the paused import makes it cheap now and expensive later.

Goal: implement the ADR-014 design and re-import the Trinity corpus fresh, so history + provenance are captured from row one (no retrofit — enabled by your D1 “re-import from scratch” call).

Checklist:

Acceptance: every canonical krithi has a creation revision and queryable provenance lineage; “what did this krithi say on date X / which source produced this section” answerable in one query; Trinity import complete on the new model.


TRACK-111 — DAL Test Suite + CI Activation (Steps 3–4)

Field Value
Status to set Not Started
Priority P0 — converts every test into a gate
Decisions D7, D8, D9, D11
Depends on TRACK-110 (substrate), TRACK-115 (clean root)
Blocks TRACK-117
Est. ~3–4 days

Goal: stand up the missing DAL tests and turn on GitHub Actions so the suite gates merges.

Checklist:

Acceptance: a red integrationTest blocks merge; DAL has real coverage; CI green end-to-end on a PR.

Docs to touch: TRACK-109 (mark W2 partially closed), integration-tests-approach.md (Steps 3–4 done).


TRACK-112 — Money-Path Service & API Scenarios (Step 5)

Field Value
Status to set Not Started
Priority P1
Decisions D9 (per-PR budget shapes scenario count)
Depends on TRACK-110, TRACK-111
Supersedes TRACK-014 (bulk-import QA)
Est. 1–2 weeks, incremental

Goal: cover the business-critical flows with real-DB integration tests, prioritized by risk.

Checklist:

Acceptance: the three-zone flow and RBAC boundary are machine-verified; per-PR integration time within budget (heavy scenarios tagged for nightly if needed).


TRACK-113 — Worker + E2E Layer (Step 6, revives TRACK-035)

Field Value
Status to set Not Started
Priority P1
Decisions D5, D12
Depends on TRACK-110, TRACK-111
Revives TRACK-035 (Playwright scaffolding)
Est. ~1 week

Goal: cross-language worker DB tests + the three E2E money paths, reusing the existing Playwright scaffolding but fitted to the Testcontainers/Flyway substrate.

Checklist:

Acceptance: worker↔backend schema contract machine-verified; three E2E paths green nightly; TRACK-035 folded in, not duplicated.


TRACK-118 — Frontend Component Tests (Vitest) — separate, after CI

Field Value
Status to set Not Started (backlog)
Priority P2
Decisions D13
Depends on TRACK-111 (CI must exist first)
Est. ~1 week

Goal: component tests on the most business-critical UI, kept off the backend critical path.

Checklist:

Acceptance: the two critical pages have meaningful component coverage; runs in CI within the frontend budget.


Existing-track bookkeeping (registry updates when tracks are created)

Track Action Reason
TRACK-093 (In Progress) Checkpoint-commit, set Paused, resume in TRACK-117 D1 — pause for versioned canon + clean re-import
TRACK-096 (In Progress) Checkpoint-commit, set Paused, resume with 093 Confirmed — re-import needs a settled payload format
TRACK-035 (Deferred) Reactivate, re-scope under TRACK-113 D5 — revive scaffolding onto new substrate
TRACK-014 (Deferred) Superseded by TRACK-112 + pointer D5 — overlaps S5/A scenarios
TRACK-109 (Epic) Update W2 “Migrations” row (Flyway, not db-migrate); link 110–113 as W2/W3 children, 116/117 as N5 data-model Keep the epic’s gap table current
ADR-014 New — authored by TRACK-116 (versioned canon) Records the data-model decision
tracks.md registry Add 110–118; bump version + date New tracks

Explicitly out of scope (D6, D17 — record so it doesn’t creep in)

Next step

Reply “create the tracks” and I’ll generate conductor/tracks/TRACK-110…118-*.md from these sections, update conductor/tracks.md, apply the existing-track status changes (pause TRACK-093 + TRACK-096, reactivate TRACK-035, supersede TRACK-014), scaffold the ADR-014 stub for TRACK-116, and run the registry-sync check (conductor/check-registry-sync.py). Nothing is committed until you ask.